Skip to main content

Maintenance in progress. You may withness broken links.

Excavation Work and Sealing of the Top Slab Joint on Ongoing at Darren Akintoye

Understanding Geotechnical Considerations for Stormwater Drainage QC in Nigeria By John Cee Onwualu (FNSE, FNICE, FNIWE, P.E., R.ENG, MASCE)

Understanding Geotechnical Considerations for Stormwater Drainage QC in Nigeria In civil engineering, the success of stormwater drainage systems depends heavily on geotechnical considerations. The interplay between soil properties and ground conditions directly impacts the quality, durability, and long-term functionality of these systems. In Nigeria, with its diverse soil profiles and environmental challenges, incorporating geotechnical insights […]

Placing of stone base at CH 0+775 on Nwelih street by submit road

How Data Validation Errors Lead to Premature Failure of Urban Drainage Systems

The Silent Killer of Infrastructure: How Data Validation Errors Lead to Premature Failure of Urban Drainage Systems By John Cee Onwualu (FNSE, FNICE, FNIWE, P.E., R.ENG, MASCE) In the complex calculus of urban infrastructure planning, the integrity of the data used for design and modelling is paramount. While civil engineers meticulously adhere to sophisticated hydraulic […]