Business strategy
With a formidable team of qualified personnel, we work towards ensuring that our goals come to reality. The team is drafted from various fields of social sciences and engineering practice, with long years of experience in their respective fields of operations.
Related contents
Related blog Posts based on page title
Maintaining Quality Control in Stormwater Drainage Projects in Remote Nigerian Locations
Maintaining Quality Control in Stormwater Drainage Projects in Remote Nigerian Locations: Challenges and Solutions By John Cee Onwualu (FNSE, FNICE,…
Robust Inspection Plan for Nigeria Stormwater Drainage
Building Resilient Foundations: Implementing a Robust Inspection and Testing Plan for Stormwater Drainage Construction in Nigeria By John Cee Onwualu…
The Role of GIS and BIM in Enhancing Stormwater Drainage Quality Control in Nigeria
The Digital Shield: How GIS and BIM are Enhancing Stormwater Drainage Quality Control in Nigeria By John Cee Onwualu (FNSE,…
Integrating Green Infrastructure and QC in Nigerian Projects
Paving the Way for a Water-Resilient Nigeria: Integrating Green Infrastructure and Quality Control in Stormwater Management By John Cee Onwualu…
Understanding Invert Levels in Flood-Control Engineering: A Case Study of Asaba’s Summit Road
Understanding Invert Levels in Flood-Control Engineering: A Case Study of Asaba’s Summit Road By John Cee Onwualu (FNSE, FNICE, FNIWE,…
Future Trends and Innovations in Stormwater Drainage Quality Control for Nigeria
Future Trends and Innovations in Stormwater Drainage Quality Control for Nigeria By John Cee Onwualu (FNSE, FNICE, FNIWE, P.E., R.ENG,…